ROTARY EQUIPMENT MAINTENANCE COST MANAGEMENT USING RELIABILITY-CENTERED MAINTENANCE (CASE STUDY: IMAM KHOMEINI SHAZAND REFINERY)


Article PDF :

Veiw Full Text PDF

Article type :

Case Report

Volume :

5

Issue :

1

Abstract :

The purpose of this study was to manage maintenance costs of rotary equipment using the maintenance and repair technique based on reliability at Imam Khomeini Shazand Oil Refining Company. So far, this type of maintenance has not been carried out at the oil Company. In this study, the two libraries and field methods were used to collect information. The statistical population was all engineers of the maintenance unit of the Imam Khomeini Shazand Oil Refining Company. Considering that the number of these people was 10, the study utilized all respondents' answers and guidance. The results of this study showed that minimization of preparation and repair times and ultimately the total time of the system will be significant. This can be achieved by reducing the time of preparation and maintenance, and ultimately helping to reduce the cost of the production system.

Keyword :

Rotating Equipment, RCM technique, Maintenance Unit Engineers, Minimizing Preparation Time, Maintenance Cost Management
Journals Insights Open Access Journal Filmy Knowledge Hanuman Devotee Avtarit Wiki In Hindi Multiple Choice GK