Abstract :
The purpose of this study was to manage maintenance costs of rotary equipment using the
maintenance and repair technique based on reliability at Imam Khomeini Shazand Oil Refining
Company. So far, this type of maintenance has not been carried out at the oil Company. In this
study, the two libraries and field methods were used to collect information. The statistical
population was all engineers of the maintenance unit of the Imam Khomeini Shazand Oil Refining
Company. Considering that the number of these people was 10, the study utilized all respondents'
answers and guidance. The results of this study showed that minimization of preparation and
repair times and ultimately the total time of the system will be significant. This can be achieved
by reducing the time of preparation and maintenance, and ultimately helping to reduce the cost of
the production system.
Keyword :
Rotating Equipment, RCM technique, Maintenance Unit Engineers, Minimizing Preparation Time, Maintenance Cost Management