A Case Study on Blackout


Article PDF :

Veiw Full Text PDF

Article type :

Original Article

Author :

Abhay Nath Dubey | Dr. Deepika Chauhan | Md. Asif Iqbal

Volume :

2

Issue :

3

Abstract :

Indian grid system is a synchronized system and presently operating as National Grid. India has five provincial grids altogether as per geological region which covers the distinct states electrical power framework to be specific these are Northern Grid, Eastern Grid, Western Grid, Southern Grid and North Eastern Grid. Southern Grid isnt synchronized with whatever is left of the areas and consequently keeps running on a marginally different frequency and associated with Western Grid and Eastern Grid through HVDC links. A power outage is the total or partial loss of energy to a territory and is the most serious type of blackout that can happen. Power outage is a transgression to the interconnected power framework. At the point when interconnected power framework goes out of step, it is basic and essential to distinguish it quickly, and islanding ought to be taken to counteract boundless power outage. Two extreme power outages influenced the greater part of northern and eastern India on 30th and 31st July 2012. The 30th July 2012 power outage influenced more than 300 million individuals and was the then biggest power blackout ever, tallying number of individuals influenced, beating the January 2001 India power outage. Within the 24 hours of restoration of this, another blackout strokes the northern part of the country. The outage of 31st July is the biggest power blackout exceeding the previous one. Abhay Nath Dubey | Dr. Deepika Chauhan | Md. Asif Iqbal "A Case-Study on Blackout" Published in International Journal of Trend in Scientific Research and Development (ijtsrd), ISSN: 2456-6470, Volume-2 | Issue-3 , April 2018, URL: https://www.ijtsrd.com/papers/ijtsrd11287.pdf Paper URL: http://www.ijtsrd.com/engineering/electrical-engineering/11287/a-case-study-on-blackout/abhay-nath-dubey

Keyword :

Smart Grid, Overload, Indian Grid, Voltage Collapse, Frequency Stability, Causes and Impact of energy outage, PMU (Phasor measurement unit), RTU (remote terminal unit), TTC (total transfer capability), unscheduled trade
Journals Insights Open Access Journal Filmy Knowledge Hanuman Devotee Avtarit Wiki In Hindi Multiple Choice GK